Advanced Energy Efficiency Upgrades Phase II at the OWB Packers Facility

This project will install energy efficient upgrades at a beef production facility.

OWB Packers, LLC

Recipient

Brawley, CA

Recipient Location

Senate District

36th

Assembly District

refresh

Active

Project Status

Project Update

The Issue

Project Innovation

This project will replace and retrofit inefficient equipment with commercially available, drop-in, high-efficiency equipment to reduce energy consumption, operating costs, and equipment downtime at the Recipient's beef production facility. Specifically, this project will demonstrate the potential for optimized vacuum systems, hydraulic systems, boiler pumps, packaging shrink tunnels, air handling systems, and controls to reduce GHG emissions, overall energy consumption, and operating costs at similar food processing facilities.

Key Project Members

Project Member

Joe Alvarado

Plant Manager

Subrecipients

Rocket

DC Energy Services

Rocket

Match Partners

Rocket

OWB Packers, LLC

Rocket

Contact the Team

*Required