Demonstration of LDES at the Rapid Integration and Commercialization Unit (RICU) Wave 2

default

Indian Energy LLC

Recipient

Anaheim, CA

Recipient Location

37th

Senate District

68th

Assembly District

beenhere

$588,281

Amount Spent

closed

Completed

Project Status

Project Result

The Issue

Project Innovation

The purpose of this agreement is to fund non-lithium-ion long duration energy storage (LDES) testing at the Rapid Integration and Commercialization Unit using four different LDES technologies at the Marine Corps Air Station Miramar in San Diego. The LDES systems will be operated both independently and as part of microgrid system to test and assess the demonstrated technology. Indian Energy LLC will develop and improve testing guidelines to evaluate the technology’s ability to power critical operations under diverse use cases, loads, and operating conditions; and will work in collaboration with first responders to develop safety guidelines for LDES systems on site.

Key Project Members

Project Member

Mike Firenze

Subrecipients

Rocket

Electric Power Research Institute, Inc.

Rocket

Michael Firenze Inc

Rocket

SMR-ISD Consulting Structural Engineers, Inc.

Rocket

Energy Design 4 All

Rocket

Coffman Engineers, Inc.

Rocket

Mr. Nice Guy Kauai

Rocket

BlueNose IT

Rocket

Global Power Group

Rocket

HDK Civil

Rocket

NAVFAC Southwest

Rocket

UL Solutions

Rocket

Contact the Team

*Required