The Issue

Project Innovation

The overarching goal of this project is to develop first-of-a-kind (FOAK) pilot demonstration to turn >20 ton/day naturally-occurring abundant “non-carbonate” rocks such as zeolite to cementitious binders for replacing 100% of Portland cement in cast-in-place concrete. Phase 1 objective (Task 1-5) is to design, install, commission, and operate a pilot 20 tons/day feed facility at the C-Crete site. Phase 2 Objective (Tasks 6-9) is to perform a full parametric study and long runs (>6 months) in the FOAK pilot facility to find the optimum range conditions for creating representative zeolite-based binder/ concretes, followed by fabrication and thorough technical testing to meet all key ASTM/ACI standards for such concretes. Phase 3 objective (Task 10-13) is incorporate the scaled-up activated zeolite binder in a ready mix batch plant and pour >20 ton cast-in-place concrete for a real-world application (a prototypical small single floor concrete house), followed by process modeling, techno-economic analysis (TEA), life cycle analysis (LCA), environmental product declaration (EPD) developments to facilitate modular commercial plant design, market penetration and commercialization

Subrecipients

Rocket

Trimeric Corporation

Rocket

ClimateEarth

Rocket

Match Partners

Rocket

C-Crete Technologies

Rocket

Contact the Team

*Required